Autostrade per l'Italia
Autostrade per l'Italia
Landscape and territory
Testata della pagina

Gronda di Genova

A strategic work for our Country, an international engineering challenge
Fine dust reduction:
up to -54%
Riduzione CO2
CO2 reduction:
-655 t
Thanks to reforestation interventions

Water protection and recovery

390 wells and springs monitored, 100% treated water

Reuse of almost 100% of excavated material

for the construction of the airport platform

Noise Reduction

9.8 km of noise barriers

Rewarding criteria for using green materials

(steels and concretes)

The infrastructure will mainly be seen by those who travel along it, as about 81% of the route runs in tunnels.

In the open-air sections, the project considers the entire area: the slopes towards the coast, the relationship of the new works with those in the surroundings, the native vegetation, the perception of homogeneity and continuity of the landscape.

The main objective of the Gronda landscape study was to verify compliance with the protection restrictions in the area and the areas of environmental value.

As part of the Environmental Impact Assessment procedure, the indications of the Ministry of Cultural Heritage and Activities to give greater architectural value to all the elements of the new infrastructure and especially to the design of the bridges and viaducts crossing the valleys were also incorporated.

Valutazione di Impatto Ambientale
sistemazioni esterne alle aree di imbocco delle gallerie

The arrangements outside the tunnel entrance areas were also designed in compliance with the recommendations of the Landscape Superintendency, which guided the designers to seek remodelling and environmental insertion solutions suitable for reconstructing the naturalness and continuity of the hill fronts in which the motorway infrastructure is inserted.

The final design of the green works, which includes the use of native plants, integrates and completes the landscaping of the entire project.

Go to top